The Friday Newsflash - September 11, 2026

Dates To Remember

Community Engagement Updates
  • SPR Sponsorship Opportunities are here! For more information visit www.smithvillemo.org/sponsor
  • Sign up for our Parks & Rec monthly newsletter HERE
  • Thank you to those who attended the Strategic Plan community forums! There is still time to participate online by visiting the Social Pinpoint website.

Senior Services Updates 

  • Thanks to dance instructor Janice Heinz from 56ReadyGo for sponsoring Super Bingo this week! It was a great turnout with 25 people attending.
  • Autumn Paint by Number program Tuesday was a great opportunity to relax and enjoy being creative.

Project Updates
Current projects can be found on our website at Smithville, MO

Maintenance Updates

  • Parks
    • Replaced melted brakers at campground over Labor Day weekend
    • Removed blown over light poles at football due to storm damage
    • Mowed all parks
    • Performed monthly brush cutting
    • Washed trucks
    • Prepared equipment for Touch-A-Truck event
    • Painted soccer and baseball fields
    Streets
    • Installed 48 inch stop signs and red flashing lights at 180th St and Old Jefferson on both sides of the road and at 180th St and Eagle Pkwy on the south side.
    • Put mower deck back together on John Deere mower.
    • Leveled off piles of dirt that were dug out of road on 176th St.
    • Received 104 tons of salt to fill bins for winter.
    • Started the process of making road repairs to Park Dr. 
    • Mowed roadsides at Eagle Pkwy, Old Jefferson, 144th St, Mount Olivet, Martin Rd., 134th St.
    • Mowed along river downtown, lot on Second Creek Rd. and along 169Hwy.
    • Picked up flags from American Legion and installed them along downtown.
    • Installed 25mph sign at 330 E. Meadow St.
  • Utilities
    • Total Drinking Water Production 9,766,000 gal.
    • Completed all testing required at the WTP.
    • Staff completed ground maintenance at WTP and water towers 
    • Conducted weekly chemical level checks at the WTP for ordering.
    • Backwashed filters 1,2,3,4 and 5 at the WTP.
    • Due to high demand the water plant had to run for 24 hours a day for over 3 days. A 3rd shift was required for this. 
    • Completed 7 work orders
    • 56 locates completed
    • Completed all testing required at WWTP
    • Staff completed ground maintenance at WWTP/Pump Stations
    • Treated 4,673,000 gallons of wastewater
    • Completed weekly checks of all booster station and towers in the distribution system.
    • Collected and delivered 3 E-coli samples to the KCMO laboratory. 
    • Staff repaired a water main break behind 409 Maple Avenue on Saturday. 
    • Completed grounds maintenance at the WWTP. 
    • Replaced the high-pressure water line on the Vac trailer. 
    • Collected the monthly WWTP sample and delivered to Pace Analytical. 
    • Staff responded to a valve vault flooding issue at the new 144th Street Lift Station, pumping out the vault and coordinating warranty repairs with Epic.